CRBB Projects




Boatshop


Ground was broken for the boatshed in April, 2009. Within a month it was completed. Six posts support a frame for a canvas roof. Rafters act as lumber storage. A workbench and a "thinking" bench are on the west side. On the east side, the lofting "floor" is hinged to the posts -- it is raised to vertical for weather protection, lowered to horizontal for use.


Tools and equipment


Planing bench.
Shaving horse.

Bench dog.
Sewing bench.
Cedar tool box.
Sharpening hand tools.
Pole lathe.


14ft Chesapeake Sharpie




Lofted: 11 July 2009
Construction began: 1 August 2009
Finished:9 April 2010
Launched:10 April 2010


11ft Flatiron Skiff





Construction began: 23 April 2010
Finished:22 July 2010
Launched:22 July 2010


Taking Local Lines




"Lally" rowboat at the Coastal Heritage Museum in Crystal River. Future event: Measure this boat, produce a table of offsets.


20ft Cedar Key Sharpie




Future project: expand the boatshop, find plans, build this boat.


Scow Schooner




Future project: really expand the boatshop, find plans, build this boat. Get USS FORT HENRY Civil War reenactors to man the guns!


Kids and Boatbuilding





Future project: Parent and child boatbuilding!