CRBB Projects |
Boatshop |
| Ground was broken for the boatshed in April, 2009. Within a month it was completed. Six posts support a frame for a canvas roof. Rafters act as lumber storage. A workbench and a "thinking" bench are on the west side. On the east side, the lofting "floor" is hinged to the posts -- it is raised to vertical for weather protection, lowered to horizontal for use. |
Tools and equipment |
| Planing bench. |
| Shaving horse. |
| Bench dog. |
| Sewing bench. |
| Cedar tool box. |
| Sharpening hand tools. |
| Pole lathe. |
14ft Chesapeake Sharpie |

|
Lofted: 11 July 2009 Construction began: 1 August 2009 Finished:9 April 2010 Launched:10 April 2010 |
11ft Flatiron Skiff |

|
Construction began: 23 April 2010 Finished:22 July 2010 Launched:22 July 2010 |
Taking Local Lines |

| "Lally" rowboat at the Coastal Heritage Museum in Crystal River. Future event: Measure this boat, produce a table of offsets. |
20ft Cedar Key Sharpie |

| Future project: expand the boatshop, find plans, build this boat. |
Scow Schooner |

| Future project: really expand the boatshop, find plans, build this boat. Get USS FORT HENRY Civil War reenactors to man the guns! |
Kids and Boatbuilding |

|
Future project: Parent and child boatbuilding! |